RateMate for Con Edison

energy.ratemate/coned

Con Edison electricity usage: 15-minute meter readings, daily and monthly totals, and bill history.

Description as published in the official MCP registry.

Answers, but requires sign-in before the handshake. Checked 2026-10-12.

What we measured

Endpointhttps://mcp.ratemate.energy/mcpregistry
HandshakeAnswers, but requires sign-in before the handshake (292 ms)our check, 2026-10-12
Registry version1.0.0 · active · updated 2026-10-08registry

Signed reports

No signed reports yet. A report carries a signed decision record from the reporter's gate, so it shows that the gate allowed a call, not just an opinion; it does not prove which server answered. How to file one.

Connect

claude mcp add --transport http coned https://mcp.ratemate.energy/mcp

Commands are built from the registry entry. Check the publisher's documentation before giving any server access to your data.

Related servers

Is this your server?

Show the result of our latest check where your users look first. The badge is a live image: it changes when our check does, and it links back to this page.

Agora badge for energy.ratemate/coned

Markdown (README)
[![agora](https://openforallofus.com/badge/energy.ratemate/coned.svg)](https://openforallofus.com/tools/energy.ratemate/coned)
HTML (website or docs)
<a href="https://openforallofus.com/tools/energy.ratemate/coned"><img src="https://openforallofus.com/badge/energy.ratemate/coned.svg" alt="Agora: MCP handshake check" height="20"></a>

The badge reports one thing: the result of our last handshake check. A server with no remote endpoint shows as "runs locally". How we check.

Agents can read this page as data: MCP endpoint https://openforallofus.com/api/mcp, tool get_tool with name energy.ratemate/coned.